Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Riverside Boat Ramp Replacement
最后更新日期:2024年5月17日 Category: 公园和娱乐 当前阶段: 设计开发
作为CMP的一部分, 社区服务 is conducting structural assessments on all piers, 栈道, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Landfill Scale House (Zemel 路)
最后更新日期:2024年5月17日 Category: 县设施 当前阶段: 离职及清仓
The scale house at the Zemel 路 Landfill is currently a trailer nearing end of expected usable lifecycle. 另外, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045
最后更新日期:2024年5月17日 类别:桥梁 当前阶段: 设计开发
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045South Gulf Cove Bridge Repairs - 建设
最后更新日期:2024年5月17日 类别:桥梁 当前阶段: 建设
South Gulf Cove Bridge Repairs - (桥梁 #014053, #014054, #014055, #014056)最后更新日期:2024年5月17日 当前阶段: Planning and Project Approval
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach an collaborative problem solving to ensure timely protective actions, 受过更多教育的人, informed and prepared population and resilient infrastructure.
Supervisor of Elections Warehouse
最后更新日期:2024年5月17日 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
提供新的20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.路 and Bridge FY23 Bridge Rehabilitations - #014049 and #014050
最后更新日期:2024年5月17日 类别:桥梁 当前阶段: 设计开发
路 and Bridge FY23 Bridge Rehabilitations - #014049 and #014050Sheriff 政府 and Hardened 911 Facility
最后更新日期:2024年5月17日 Category: 已缴纳的销售税 Category: 县设施 当前阶段: Planning and Project Approval
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.